20.2.1 |
C3132 |
BASE DE BRITA GRADUADA (S/TRANSP) |
M3 |
152,0200 |
20.2.2 |
C3133 |
BASE MACADAME HIDRÁULICO C/ENCHIMENTO DE AREIA (S/TRANSP) |
M3 |
128,0500 |
20.2.3 |
C3134 |
BASE SOLO BRITA COM 20% DE BRITA (S/TRANSP) |
M3 |
65,0300 |
20.2.4 |
C3135 |
BASE SOLO BRITA COM 30% DE BRITA (S/TRANSP) |
M3 |
78,6400 |
20.2.5 |
C3136 |
BASE SOLO BRITA COM 40% DE BRITA (S/TRANSP) |
M3 |
92,1700 |
20.2.6 |
C3137 |
BASE SOLO BRITA COM 50% DE BRITA (S/TRANSP) |
M3 |
105,8000 |
20.2.7 |
C3138 |
BASE SOLO BRITA COM 60% DE BRITA (S/TRANSP) |
M3 |
119,3200 |
20.2.8 |
C3217 |
ESTABILIZAÇÃO GRANULOMÉTRICA DE SOLOS S/ MISTURA DE MATERIAIS (S/TRANSP) |
M3 |
27,9600 |
20.2.9 |
C3216 |
ESTABILIZAÇÃO GRANULOMÉTRICA DE SOLOS C/ MISTURA DE MATERIAIS (S/TRANSP) |
M3 |
33,8400 |
20.2.10 |
C3215 |
ESTABILIZACÂO SOLO BETUME MISTURADO NA PISTA (S/TRANSP) |
M3 |
42,0200 |
20.2.11 |
C3930 |
SUB BASE/BASE DE SOLO CAL (3%) (S/TRANSP) |
M3 |
87,0600 |
20.2.12 |
C3931 |
SUB BASE/BASE DE SOLO CAL (4%) (S/TRANSP) |
M3 |
105,4700 |
20.2.13 |
C3968 |
SUB BASE/BASE DE SOLO CAL (5%) (S/TRANSP) |
M3 |
123,8900 |