Tabela de Custos - Versão 028 - ENC. SOCIAIS 114,15%

C3151 - CONCRETAGEM DE TUBULÃO (CAMISA/ENCHIM.) AR COMP. D=1,40m ATÉ 12m
Preço Adotado: 3.656,7200 Unid: M
Código Descrição Unidade Coeficiente Preço Total
EQUIPAMENTOS (CHORARIO)
I0658 TALHA MANUAL (CHI) H 0,0000 0,1895 0,0000
I0771 TALHA MANUAL (CHP) H 1,0000 0,2666 0,2666
I0628 GRUPO GERADOR 36 KVA (CHI) H 0,0000 29,9694 0,0000
I0742 GRUPO GERADOR 36 KVA (CHP) H 1,0000 67,7468 67,7468
I0569 BOMBA COM MOTOR A DIESEL (CHI) H 0,4000 27,3177 10,9271
I0683 BOMBA COM MOTOR A DIESEL (CHP) H 0,6000 36,0543 21,6326
I0614 COMPRESSOR DE AR 250 PCM (CHI) H 0,0000 47,4699 0,0000
I0728 COMPRESSOR DE AR 250 PCM (CHP) H 1,0000 137,6289 137,6289
I0593 CAMPÂNULA DE AR COMPRIMIDO (CHI) H 0,0000 13,7470 0,0000
I0707 CAMPÂNULA DE AR COMPRIMIDO (CHP) H 1,0000 18,7641 18,7641
I0651 RESERVATÓRIO DE AR COMPRIMIDO (CHI) H 0,0000 3,3943 0,0000
I0764 RESERVATÓRIO DE AR COMPRIMIDO (CHP) H 1,0000 4,6330 4,6330
TOTAL EQUIPAMENTOS (CHORARIO)261,5991
MAO DE OBRA
I2136 TRABALHADOR AR COMPRIMIDO H 6,0000 26,8600 161,1600
I2578 SINALEIRO H 2,7000 26,8600 72,5220
I2391 PEDREIRO H 2,7000 26,8600 72,5220
I2543 SERVENTE H 6,0000 20,2600 121,5600
TOTAL MAO DE OBRA427,7640
SERVIÇOS
C1405 FORMA PLANA CHAPA COMPENSADA RESINADA, ESP.= 12mm UTIL. 3 X M2 7,5400 146,4680 1.104,3687
C3270 CONCRETO P/VIBR., FCK=15MPa COM AGREGADO PRODUZIDO (S/ TRANSP.) M3 1,5300 456,2383 698,0446
C0216 ARMADURA CA-50A MÉDIA D= 6,3 A 10,0mm KG 92,0000 12,3324 1.134,5808
TOTAL SERVIÇOS2.936,9941
MATERIAIS
I2579 TORRE METALICA UN 0,0110 2.760,2100 30,3623
TOTAL MATERIAIS30,3623
Total Simples 3.656,72
Encargos INCLUSOS
BDI 0,00
TOTAL GERAL 3.656,72