C3152 - CONCRETAGEM DE TUBULÃO (CAMISA/ENCHIM.) AR COMP. D=1,40m DE 12/18m |
Preço Adotado: 3.784,5100 |
Unid: M |
|
Código
| Descrição |
Unidade
| Coeficiente |
Preço |
Total |
EQUIPAMENTOS (CHORARIO) |
I0658 |
TALHA MANUAL (CHI) |
H |
0,0000 |
0,1895 |
0,0000 |
I0771 |
TALHA MANUAL (CHP) |
H |
1,0000 |
0,2666 |
0,2666 |
I0628 |
GRUPO GERADOR 36 KVA (CHI) |
H |
0,0000 |
29,9694 |
0,0000 |
I0742 |
GRUPO GERADOR 36 KVA (CHP) |
H |
1,0000 |
67,7468 |
67,7468 |
I0569 |
BOMBA COM MOTOR A DIESEL (CHI) |
H |
0,4000 |
27,3177 |
10,9271 |
I0683 |
BOMBA COM MOTOR A DIESEL (CHP) |
H |
0,6000 |
36,0543 |
21,6326 |
I0614 |
COMPRESSOR DE AR 250 PCM (CHI) |
H |
0,0000 |
47,4699 |
0,0000 |
I0728 |
COMPRESSOR DE AR 250 PCM (CHP) |
H |
1,0000 |
137,6289 |
137,6289 |
I0593 |
CAMPÂNULA DE AR COMPRIMIDO (CHI) |
H |
0,0000 |
13,7470 |
0,0000 |
I0707 |
CAMPÂNULA DE AR COMPRIMIDO (CHP) |
H |
1,0000 |
18,7641 |
18,7641 |
I0651 |
RESERVATÓRIO DE AR COMPRIMIDO (CHI) |
H |
0,0000 |
3,3943 |
0,0000 |
I0764 |
RESERVATÓRIO DE AR COMPRIMIDO (CHP) |
H |
1,0000 |
4,6330 |
4,6330 |
TOTAL EQUIPAMENTOS (CHORARIO) | 261,5991 |
MAO DE OBRA |
I2136 |
TRABALHADOR AR COMPRIMIDO |
H |
7,8000 |
26,8600 |
209,5080 |
I2578 |
SINALEIRO |
H |
3,5000 |
26,8600 |
94,0100 |
I2391 |
PEDREIRO |
H |
3,5000 |
26,8600 |
94,0100 |
I2543 |
SERVENTE |
H |
7,8000 |
20,2600 |
158,0280 |
TOTAL MAO DE OBRA | 555,5560 |
SERVIÇOS |
C1405 |
FORMA PLANA CHAPA COMPENSADA RESINADA, ESP.= 12mm UTIL. 3 X |
M2 |
7,5400 |
146,4680 |
1.104,3687 |
C3270 |
CONCRETO P/VIBR., FCK=15MPa COM AGREGADO PRODUZIDO (S/ TRANSP.) |
M3 |
1,5300 |
456,2383 |
698,0446 |
C0216 |
ARMADURA CA-50A MÉDIA D= 6,3 A 10,0mm |
KG |
92,0000 |
12,3324 |
1.134,5808 |
TOTAL SERVIÇOS | 2.936,9941 |
MATERIAIS |
I2579 |
TORRE METALICA |
UN |
0,0110 |
2.760,2100 |
30,3623 |
TOTAL MATERIAIS | 30,3623 |
|
Total Simples |
3.784,51 |
Encargos |
INCLUSOS |
BDI |
0,00 |
TOTAL GERAL |
3.784,51 |
|